Project Name: Brandy Bridge
Project Address: Abercanaid, Merthyr Tydfil, CF48 1YF
Concrete Repair System: StoCrete TV308, TG203 Repair mortar & TF204 fairing coat
Description of activity
Continued works to Brandy Bridge with StoCrete TV308 and now with the application of StoCrete TG203 and TF204 Fairing coat.
PPE requirements
- Hard hats
- Safety boots
- Hi-vis Orange full Clothing
- Safety gloves
- Safety glasses
Observations
Works progressing well repair works have now taken place to the support columns of the Bridge with Stocrete TV308 and TG203 repair mortar for repairing the holes left by the letterbox shutter. Whilst on site I observed the application of StoCrete TF204 fairing coat to the bridge beam exposed ends this application will give further protection to the concrete and imbedded reinforcing steel.
StoCrete TG203 used to repair bridge abutment wall.
Letterbox opening at the top of shutter on bridge columns. Typical StoCrete TG203 repair after concrete has been recast with StoCrete TG203 below the repair.
Repaired column with StoCrete TV308
Chases in the concrete ready to receive cathodic protection, also StoCrete TV308 repairs with further shuttering below.
Mixing StoCrete TF204 fairing coat.
Applying StoCrete TF204
StoCrete TF204 being applied to the beam ends
StoCrete TF204
StoCrete TF204 being applied to the soffit of the beam ends
StoCrete TF204 being finished to a paint grade finish
StoCrete TF204 finished ready to receive anti-carbonation coatings
Conclusion
The works at Brandy Bridge is progressing well. Next site visit will be for the application StoCryl Anti-carbonation coatings.